Yacht is no longer available for sale.

Yacht is no longer available for sale.

This is an archived web page showing historic information for reference purposes only. Search Yachts for Sale.

PALM B Yacht for Sale

Length
121' (37m)
Builder
CUSTOM
Build
1997/2020
Cabins
5
Crew
7

Yacht is no longer available for sale.
This is an archived web page showing historic information for reference purposes only. Search Yachts for Sale.

Specifications

Builder CUSTOM
Length (LOA) 121' (37m)
Year 1997
Year Refit 2020
Gross Tonn. 230
Draft 7' (1.84m)
Beam 23' (7.2m)
Range 1,500 NM
Location Italy

Accommodations

Staterooms 5
Sleeps 10
Heads 6
Crew Cabins 7
Crew Sleeps 7

Dimensions & Capacity

LOA 121' (37m)
Min Draft 7' (1.84m)
Max Draft 7' (1.84m)
Gross Tonn. 230

Construction

Hull Material Cold Molded
Cruising Speed 12 Knots
Range 1,500 NM
Have Questions?

Complete the form below and one of our experienced sales brokers will be in touch soon.

Full Details

Other Machinery

  • Exhaust system: Wet Exhaust
  • Speeds & fuel consumptions: Cruising 12kts @ 150 LPH per engine
  • Rudder Angle indicator: 2 x indicators, on main / 2nd steering + Emergency Steering wheel
  • Fuel filters: Racon Filters + secondary spin on fuel filters
  • Fuel separator: 1 x Alfa Laval MMB 2035-13
  • Oil/Water separator: Combined with Racon fuel filters
  • Fire/Bilge pump: 2 x Fire pumps + 1x Bilge pump – 2nd Fire pump can be configured to be a bilge pump
  • Boilers: 2
  • Sewage treatment: Tecnicomar Ecomar 16 Serial Number: 240512EC198
  • WC system: Headhunter Royal Flush
  • Water makers: 1 x Sea Recovery Reverse Osmosis Water Maker

Galley & Laundry Equipment

  • Stove: Wolf
  • Grill: Wolf
  • Oven: Gaggenau
  • Microwave; 1x Bosch 600W + 1x
  • Refrigerators: 2 x Subzero Galley Fridges / freezers + 2 x Bar fridges + Crew Mess fridge
  • Freezers: 2 x Freezers separate from galley freezers
  • Ice maker: 2 x Ice Makers
  • Coffee machine: 2 x Coffe Machines
  • Dishwasher: 1x Dishwasher Miele
  • Washing machine: 2 x Miele washing machines
  • Tumble dryer: 1 x Tuble Dryer Miele
  • Steam iron: 1 x steam iron

Entertainment Equipment

  • TVs, speakers, amplifiers, sat system, telephone and controls systems etc
  • Main Salon: Samsung 65” Ipad / Apple Tv / Netflix / Sonos / Popcorn Moives
  • Skylounge: 2 x Tharas 200 Amps / Sonos
  • Master stateroom: Samsung 65 “ RCI Controls / Apple Tv / Netfilx
  • Office: Samsung 42”
  • Guests staterooms: Samsung 32” RCI Conrols / Apple Tv / Netflix
  • Sundeck: 6x 6x9 Speakers outside + 2 x Amplifiers
  • Crew mess: 1 x Samsung 32” LCD Tv
  • Computer: HP Laptop
  • Printer: Canon MX 925
  • Ship’s safes: 1 in Captains cabin

Deck Equipment

  • Anchor windlass: 2 x 4kW MuireVR5000 Capstans
  • Aft warping capstans: 2 x 4kW Muire VR5000 Capstans
  • Anchor chains : 2 x 115m Length anchor chains – Port & Stb
  • Passerelle: Hydraulic controlled Passerelle
  • Swim ladder
  • Searchlights: 2 x top mounted, 1x port mounted + 1 x stb mounted
  • Underwater lights: 4 x Aft under water lights
  • Awnings on Sundeck and Fore deck

Safety & Security Equipment

  • Life rafts: 4 x RFD Solas 16 Man
  • Life jackets: 23
  • Immersion suits: 15 Solas Viking
  • Lifebuoys: 4
  • EPIRB: 1
  • SART: 2
  • Fire fighting system: Fixed CO2 system in engine room + 3 water points located around the vessel
  • Extinguishers: 23
  • Alarm system: Bilge alarm system, Fire alarm panel TYCO T1200
  • Gas detection system:
  • CCTV: 1 x Camera in engine room + 1 x on At deck
  • Oxygen tank

Tender & Toys

  • Tender, engines and hp: Williams Diesel 450 Jet Tender
  • Watersports equipment: 2 x Wakeboards, 2 Pairs of double Ski’s, 2 x Inflatable doughnuts, 1 x inflatable
  • SUP
  • Diving equipment: Goggles, Snorkels + Flippers
  • Gym equipment: 1 x Exercise bike in Master Study

Refit History

Main Engines:

  • 32x New Injectors Installed. 16x Per engine June 2020
  • Borescope both engines – Internally sounds, almost no wear on liners June 2020
  • Coolant tanks acid washed and filled with new coolant June 2020
  • New Master and Receiver ECM installed onto Stb Engine 2018
  • Complete new wire harness installed with new ECM’s – Stb engine 2018
  • 1x New raw water pump installed on Stb engine 2020
  • Complete new Wire harness installed onto Port Engine July 2020
  • 4x New Starter Batteries Installed 2020
  • New BBIM installed onto Stb engine 2018
  • New SRS (synchronized rev sensor) installed onto Stb engine 2018
  • New Coolant and oil pressure sensors installed onto both engines 2018
  • Replace all pressure and vacuum gauges on Main engines 2018
  • Replace all fuel hoses with SS hose ends 2020

All other work was general servicing every 200 Hours or every 12 months, whichever came first. Engines
started once every 2 weeks during off periods.

Generators:

  • Complete rebuild of both Port and Stb generators from the Crank up. A detailed report can be given upon request Nov 2020

All other work was general servicing every 250 Hours or every 12 months, whichever came first.

  • Generators started once every 2 weeks during off periods.
  • AC Plant:
  • New Raw seawater circulation pump Nov 2020
  • New Fresh water circulation pump 2020
  • Re-gassed all compressors before every season starts Every year
  • Various new breakers, relays, transforms installed inside Electrical box. Motherboards on both systems has been repaired and checked Oct 2020
  • New insulation around piping running in engine room March 2020
  • Other work includes keeping the pressure in the system at the correct level
  • Water Maker:
  • New high pressure pump installed April 2020
  • New UV Sterilization lamp installed 2020
  • Other work includes general filter changes and flushing of the system with fresh water.

Stabilizers:

  • New Accumulator installed on HPU 2020
  • Complete new hydraulic hoses installed on entire system 2020
  • New pressure gauges installed 2020
  • Pulled both shafts and changed from a sea water lubrication system to a grease lubrication system withNnew bushes 2020
  • Other work includes changing filters, oil, fixing leaks and greasing electric motor bearings. Generally system works well.

Bow Thruster:

  • New hydraulic Motor 2020
  • New Hydraulic Parker Piston Pump 2020
  • New hoses installed on the entire system 2020
  • New pressure gauges 2020
  • Other work includes changing filters, oil, fixing leaks and greasing electric motor bearings. Generally system works well.

Sewage Treatment Plant:

  • New sewage holding tank in engine room 2020
  • New dosing pump for treating sewage 2018
  • New relief valve for holding tank and piping modification 2020
  • New control system – Motherboard, touchscreen ect 2018

Steering System:

  • New control Box for both main and secondary steering systems 2020
  • New DCV installed onto secondary steering HPU 2020
  • Complete new hoses installed on entire steering system 2020
  • Other work includes replacing filters, oil and fixing leaks

Garage HPU:

  • Complete new hoses installed on entire garage HPU 2020
  • New pressure gauge installed 2020
  • New through deck fittings installed and painted 2020
  • Stb cylinder’s shaft re-chromed and machined + new seals Nov 2020
  • Load holding valves on both cylinders reconditioned Nov 2020
  • Other work includes replacing filters, oil and fixing leaks.
  • Sun deck and fore deck re caulked / repairs 2020
  • New Sun deck bar + exterior tables. 2020
  • New cushions / covers throughout. 2020
  • New carpets through out in guest and crew area. 2020
  • New Radar Magnatron + Furuno Sat compass 2020.
  • New Simad Autopilots 2018/2020
  • New Raymarine AXIOM MFD plotters (2)
  • Hull and superstructure painted 2020 (Awlgrip)
How to Buy a Yacht Our experienced brokers will assist you throughout your yacht buying journey
Northrop & Johnson
Hi there!
Would you like to get more information about PALM B? Our brokers are standing by to help.