Asking
$ 3,349,000

CHANGE ORDER Yacht for Sale

Length
59' (17.98m)
Builder
Hatteras
Build
2021
Cabins
3
Asking Price
$ 3,349,000

 This 2021 HATTERAS 59’ GT59 CONVERTIBLE “Change Order” is a 3 stateroom 2 head layout with 600hrs on reliable CAT C32A engines. The engines are still under warranty and warranty can be extended out further. All service is up to date on engines and generators with records. The 2021 59’ HATTERAS CONVERTIBLE is loaded with options and is in very nice condition. Call to inquire for more information or schedule a showing on "Change Order" the 2021 HATTERAS 59’ CONVERTIBLE GT59.

HIGHLIGHTS

Specifications

Builder Hatteras
Model gt59 convertible
Length (LOA) 59' (17.98m)
Year 2021
Draft 4' 9" (1.45m)
Beam 18' 9" (5.72m)
Location Stuart, United States

Accommodations

Staterooms 3
Heads 2
Capt. Quarters No

Dimensions & Capacity

LOA 59' (17.98m)
LWL 52' (15.77m)
Max Draft 4' 9" (1.45m)
Fuel Tank 1,750 g (6,624 L)
Fresh Water 200 g (757 L)
Holding Tank 120 g (454 L)
Displacement 89,000

Construction

Hull Material Fiberglass
Stabilizers None

Engines (x2)

Engine Make Caterpillar
Engine Model C-32A
Power HP 1,600
Power KW 1,193
Fuel Type Diesel
Have Questions?

Complete the form below and one of our experienced sales brokers will be in touch soon.

How to Buy a Yacht Our experienced brokers will assist you throughout your yacht buying journey

Northrop and Johnson is pleased to assist you in the purchase of this vessel. This boat is centrally listed by HMY Yacht Sales, Inc.. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

Similar Yachts for Sale

View All

Hatteras Yachts for Sale

View More
Northrop & Johnson
Hi there!
Would you like to get more information about CHANGE ORDER? Our brokers are standing by to help.