Main works completed since purchase 2021:
Engineering
Main Engines (€85,000)
- Complete overhaul and replacement of faulty parts
- Ceramic coating of exhausts
Gearboxes (€25,000)
- Complete overhaul and replacement of faulty parts
Shafts (€35,000)
- Removed, inspected and measured as per class requirement
Rudders and steering system (€75,000)
- Removed, inspected and measured as per Class requirement
- Steering system overhaul and replacement of faulty parts
Generators (€60,000)
- Complete overhaul and replacement of faulty parts
- Ceramic coating of exhausts
Stabilisers (€140,000)
- Removed and inspected
- Both pumps replaced and system fully recommissioned
Hydraulic system (€25,000)
- Complete system flushing, overhaul and oil replacement
Bow thruster (€35,000)
- Complete overhaul and replacement of faulty parts
- Motor removed and rewound, coupling replaced
Valves (€55,000)
- All overboard valves serviced or replaced as per Class requirement
Pumps (€30,000)
- All pumps serviced or replaced
Tanks (€30,000)
- All tanks cleaned and inspected as per Class requirement
- Grey and black water system flushed and cleaned
Water maker (€25,000)
- Overhauled and fully recommissioned
Air conditioning (€45,000)
- Full system overhaul, rebalancing and replacement of faulty parts
Electrical (€350,000)
- Full system diagnostics and Megger testing completed
- Installation of new shore power convertor and cooling system
- Battery charging system replaced with upgraded components
- All front-end electronics and lighting in process of being updated
Mooring equipment (€10,000)
- Inspected and serviced as per manufacturer’s requirements
AV/IT (€200,000)
- New VSAT dishes and infrastructure
- New 4G solution and infrastructure
- New servers and Wi-Fi network distribution
- New internal IP based telephone system
- Recommissioning of original AV system with new components
- Analysis and reporting
- Post works recommissioning, noise and vibration analysis completed
- Records
- All planned and unplanned maintenance recorded on IDEA
Deck
Windows (€900,000)
- All delaminated glass replaced and certified by Class
Transom door (€300,000)
- Removed, repaired, serviced and painted
Antifouling (€110,000)
- Hull blasted and had cleaned
- New antifouling paint applied
Paint (€675,000.00)
Navigation equipment (€35,000)
- New bridges screens and replacement if broken components
Varnish (€50,000)
- All varnish work repaired and recoated
Furniture (€50,000)
- All loose teak furniture striped and refurbished
Tenders (€100,000)
- Primary guest tender refitted and returned to as new condition
Jet skis (€40,000)
- New Yamaha Waverunners SVHO 2022 model
Water sports equipment (€100,000)
- Improved inventory of equipment including self-propelled foiling and surf boards, wakeboards, inflatable platforms, etc.
Interior
Guest provisions (€200,000)
- All guest service ware, linen, bedding, towels replaced
Cosmetics (€75,000)
- All major interior touch ups and cosmetic improvements completed sympathetically
Fixings (€50,000)
- Broken interior fixings and fixtures replaced
Marble (€35,000)
- Broken or stained marble repaired or replaced
- Soft furnishings and carpets (€75,000)
- Many items of soft furnishing replaced or removed
- Loose carpets removed and wooden flooring repaired
Machinery (€50,000)
- Washing machines and tumble dryers replaced
- All small service items repaired or replaced
Crew areas (€75,000)
- Crew mess and cabins refurbished
Galley
Equipment (€40,000)
- Serviced, upgraded or replaced
- Estimated minimum total €4,185,000.00
Main works in progress 2023
Engineering
- Shell door openings
- Inspection and system overhauls
- Boarding arrangements
- Inspection and system overhauls
- Spare parts storage and inventory
- Installation of dedicated racking and cataloguing of parts
- Cable running
- Running Starlink and new radar cables from mast to wheelhouse
- Foredeck crane
- Recommissioning by OEM to as new operational standard
Deck
- Navigation equipment
- New X-band radar and GPRS unit installation
- Teak decks
- Transom door teak being replaced
- Teak deck repairs and replacement being carried out
- Garage organisation
- Installation of dedicated racking for water sports equipment
- Swim platform and transom door
- Reorganisation of railings and mooring arrangements
Interior
- Continuation or interior improvements
- Ongoing work to improve overall aesthetic standard of interior areas