Yacht is no longer available for sale.
Yacht is no longer available for sale.
This is an archived web page showing historic information for reference purposes only. Search Yachts for Sale.
LADY LI Yacht for Sale
Yacht is no longer available for sale.
This is an archived web page showing historic information for reference purposes only. Search Yachts for Sale.
Amenities
-
Beach Club
-
Crane
-
Gym
-
Jacuzzi
-
Personal Watercraft
-
Stabilizers
-
Tender Garage
-
Wi-Fi
In The News
Specifications
| Builder | HEESEN YACHTS |
|---|---|
| Length (LOA) | 162' (49.6m) |
| Year | 2015 |
| Gross Tonn. | 499 |
| Beam | 29' (9m) |
| Range | 4,000 NM |
| Location | Italy |
Accommodations
| Staterooms | 5 |
|---|---|
| Sleeps | 10 |
Dimensions & Capacity
| LOA | 162' (49.6m) |
|---|---|
| Min Draft | 10' (2.92m) |
| Fuel Tank | 15,850 g (60,000 L) |
| Fresh Water | 5,283 g (20,000 L) |
| Gross Tonn. | 499 |
| Displacement | 437 |
Construction
| Hull Material | Stainless Steel |
|---|---|
| Hull Config | Displacement w/ Bulbous Bow |
| Ext. Designer | Clifford Denn |
| Int. Designer | Reymond Langton |
| Cruising Speed | 12 Knots |
| Range | 4,000 NM |
Complete the form below and one of our experienced sales brokers will be in touch soon.
Full Details
Other Machinery
- Fresh Water Maker: 2 X Hem 25/1600 Modular Version
- Capacity Of 6,000 Litres Per Day Each
- Hot Water Boiler: 2 X 300 Litres
- Sanitary Treatment: Hamann Hl-cont Plus 05
- Air-conditioning: Heinen & Hopman
- Anchor Winch: Staalart
- Mooring Capstan Staalart
- Side Boarding Ladder Hydromar
- Passarelle: Hydromar
- Jacuzzi Custom Made
- Tender Crane Hydromar, Swl 2000 Kg
Accommodation
- Glamorous and comfortable, her full-beam master suite is situated forward on the main deck, the suite is accessed by a large private office and opens into an elegant His & Hers marble bathroom.
- Set on the lower deck, SAIRU’S guest accommodation includes three double cabins plus an additional twin cabin set. Each cabin enjoys an entertainment system plus ensuite bathroom facilities.
Refit History
Lists of more significant repair and maintenance works completed since February 2022
La Seyne Sur Mer 2022
General
- Successful completion of Change of Flag and Name.
- Annual Flag and Class Surveys completed.
- All certificates issued by BVI’s and Lloyds
LSA & FFE
- Annual service of Fire Extinguisher’s
- Annual service of Immersion Suits
- Annual service of all Life jackets
- Annual service of Ribo 450 Rescue tender
- Annual service of BA Fire fighting equipment
- Annual calibration of Gas detectors
- Annual service of x 4 Life rafts
- Annual service of the Novec 230
- Annual service of the Marrioff Hi Fog system.
- New Flares
- Full Medical kit update through YMS.
- MOB rescue crane new cable and serviced by Hydromar.
- New Vinyl stickers on Life Boyes
- New approved Fire Mans Radios for BA team.
- New Drager Fire Mans control board
Bridge Equipment & Comms
- Radio Holland Shore Based Maintenance
- ECDIS PC Repair ( All updates and maintenance completed)
- Transas PAYS
- Transas Chart Updater installed
- New Hytera UHF radios
Exterior Works completed
- International Micron 350 anti fouling applied
- Propspeed Applied to Propellors, shafts and bow thruster
- New Starboard Anchor
- Anchor chain cleaned and new markings painted
- Chain Bins cleaned and repainted
- Anchor locker bilges and floor boards repainted
- Windlass motors repainted
- Rescue tender bay floor repainted with AWL Grip paint system + Non skid
- X 4 New 512 liter storage bins for tender bay
- Hull & Superstructure polished by RMP and products supplied.
- Beach Club has a new 10mm Teak deck, old veneer floor removed
- Beach Club bilges repainted with Damboline bilge paint.
- Transom Door repainted
- Beach Club Marble chips repaired and polished
- Swim Platform new custom made awning with stainless steel poles and pulley system
- Upholstery work done to exterior cushions and zips
- Exterior Bars chips repaired and polished
- Main Deck table repainted with AWL Grip paint ( Superjet Black)
- Bridge Deck small tables repainted with AWL Grip
- Passarella repainted and corrosion removed
- Corrosion on Superstructure removed and repainted (Paint file available)
- Corrosion the Hull treated and repainted
- Sika redone on the hull rub rails
- Lockers repainted :
- Sundeck storage locker
- All decks Fire hydrant lockers
- Main deck safety locker
- Main Deck Immersion suit locker
- Bow storage lockers
- Fore peak locker
- Sundeck showers replaced
- Various exterior grills replaced
- Swim deck platform fittings cleaned and resealed
- New Stainless steel name signs on Port, STB and Transom Door.
- New Liros 34mm Mooring lines with spliced leather eye
- 25 Meter 34mm x2
- 20 Meter 34mm X2
- 15 Meter 32 mmx 2
- New Neoprene Fender covers on all fenders
- All corrosion on the mast treated and repainted
- Sundeck sliding Doors Checked by Hofnagels and some guide wheels changed.
Tender & Toys
- X2 new Seadoo Trixx 2 up Jet skis 2022 Model
- X1 Yamaha Superjet Serviced
- New Beach Setup Equipment:
- X1 Weber BBQ
- X2 Gazebos
- X 3 Picknick Tables
- X 10 Beach Chairs
- X 2 Umbrellas
- X 1 Set of Cutlery
Interior
- Carpet Cleaning
- Interior Marble Polished professionally
- Leather and suede treated
- Scratch and dent repairs done on the interior wood.
AV/IT
New AV/IT Equipment:
- X 13 New Apple Ipad mini 6, 64GB Space Grey
- X13 Iport Docking stations
- X1 Kerio NG511 Hardware Appliance
- X1 Intel NUC 7 for management c/w SSD, DD & License
- Pepwave Sim Injector
- Pepwave Maritme 5G Antenna
Work done on the AV/IT System:
- Installation and configuration of 5G system c/w antennas
- Service and maintenance of the 2 x TVRO antennas system and 1 x VSAT system.
- Installation and configuration of x1 Kerio control with licenses
- Installation and configuration of x1 Management NUC with licenses
- VBH did the labour for reverse engineering, installation, configuration & commissioning the IT network onboard.
- VBH did the labour for reverse engineering, installation & commissioning the AV system onboard.
Main engines
- top end overhaul done
- replaced sea water and coolant pumps
- replaced heat exchanger plates with new gaskets
- 3 way solenoid valves replaced
- oil analysis done
Gear boxes
- yearly maintenance (oil change and oil cooler cleaning done)
Generators
- complete major overhaul done with new injectors, turbochargers, pumps, pistons, jackets etc.
- tested all alarms and sensors
Halyard exhaust system
- yearly survey and system check done by Halyard technicians
- both separator boxes have been repaired
Shore power converter
- Complete overhaul done on all 3 modules, replaced all components and cooling fans
Naiad stabilizers
- replaced hydraulic cylinders
- replaced valve cartridges
- replaced hydraulic hoses
- replaced potentiometers
- oil and filters replace replaced
Fresh water system
- Hot water boilers replaced
- Water softener complete overhaul
- Carbon filter complete overhaul
- Water maker salinometer and regulating valve replaced
- all freshwater tanks cleaning and touch up done
- UV lamp and sensor replaced
- Fresh water analysis done
- silver ionizer anode replaced
- deck wash unit replaced membranes, filters and display
HVAC
- oil replaced in both compressors
- compressor oil analysis
- condenser cleaning done
- glycol analysis
- all fan coils cleaning
- replaced 6 noisy blowers on fan coils around cabins
- complete duct cleaning done (extraction lines, supply lines, recirculation lines) including galley and laundry duct cleaning
- galley extraction fan and motor bearings replaced
- making unit motor and fan bearings replaced
Sewage system
- all black and grey water lines cleaned with chemicals from each toilet and sink
- Hamman plant maintenance done (replaced air distribution block, all valve actuators have been overhauled, replaced UV lamp)
- Sewage tank has been cleaned and repainted
RWO Oily water separator
- survey and maintenance done by authorized company (certificates issued, calibration done, replaced filters, replaced solenoids
Air system
- replaced screw pump
- yearly maintenance done (replaced oil, filters, water separators)
Bow thruster
- gearbox oil replaced
Anchor windlasses
- gearbox oil replaced
- brake pads replaced
Steering gear
- power pack oil and filters replaced
Similar Yachts for Sale
Full Details
Other Machinery
- Fresh Water Maker: 2 X Hem 25/1600 Modular Version
- Capacity Of 6,000 Litres Per Day Each
- Hot Water Boiler: 2 X 300 Litres
- Sanitary Treatment: Hamann Hl-cont Plus 05
- Air-conditioning: Heinen & Hopman
- Anchor Winch: Staalart
- Mooring Capstan Staalart
- Side Boarding Ladder Hydromar
- Passarelle: Hydromar
- Jacuzzi Custom Made
- Tender Crane Hydromar, Swl 2000 Kg
Accommodation
- Glamorous and comfortable, her full-beam master suite is situated forward on the main deck, the suite is accessed by a large private office and opens into an elegant His & Hers marble bathroom.
- Set on the lower deck, SAIRU’S guest accommodation includes three double cabins plus an additional twin cabin set. Each cabin enjoys an entertainment system plus ensuite bathroom facilities.
Refit History
Lists of more significant repair and maintenance works completed since February 2022
La Seyne Sur Mer 2022
General
- Successful completion of Change of Flag and Name.
- Annual Flag and Class Surveys completed.
- All certificates issued by BVI’s and Lloyds
LSA & FFE
- Annual service of Fire Extinguisher’s
- Annual service of Immersion Suits
- Annual service of all Life jackets
- Annual service of Ribo 450 Rescue tender
- Annual service of BA Fire fighting equipment
- Annual calibration of Gas detectors
- Annual service of x 4 Life rafts
- Annual service of the Novec 230
- Annual service of the Marrioff Hi Fog system.
- New Flares
- Full Medical kit update through YMS.
- MOB rescue crane new cable and serviced by Hydromar.
- New Vinyl stickers on Life Boyes
- New approved Fire Mans Radios for BA team.
- New Drager Fire Mans control board
Bridge Equipment & Comms
- Radio Holland Shore Based Maintenance
- ECDIS PC Repair ( All updates and maintenance completed)
- Transas PAYS
- Transas Chart Updater installed
- New Hytera UHF radios
Exterior Works completed
- International Micron 350 anti fouling applied
- Propspeed Applied to Propellors, shafts and bow thruster
- New Starboard Anchor
- Anchor chain cleaned and new markings painted
- Chain Bins cleaned and repainted
- Anchor locker bilges and floor boards repainted
- Windlass motors repainted
- Rescue tender bay floor repainted with AWL Grip paint system + Non skid
- X 4 New 512 liter storage bins for tender bay
- Hull & Superstructure polished by RMP and products supplied.
- Beach Club has a new 10mm Teak deck, old veneer floor removed
- Beach Club bilges repainted with Damboline bilge paint.
- Transom Door repainted
- Beach Club Marble chips repaired and polished
- Swim Platform new custom made awning with stainless steel poles and pulley system
- Upholstery work done to exterior cushions and zips
- Exterior Bars chips repaired and polished
- Main Deck table repainted with AWL Grip paint ( Superjet Black)
- Bridge Deck small tables repainted with AWL Grip
- Passarella repainted and corrosion removed
- Corrosion on Superstructure removed and repainted (Paint file available)
- Corrosion the Hull treated and repainted
- Sika redone on the hull rub rails
- Lockers repainted :
- Sundeck storage locker
- All decks Fire hydrant lockers
- Main deck safety locker
- Main Deck Immersion suit locker
- Bow storage lockers
- Fore peak locker
- Sundeck showers replaced
- Various exterior grills replaced
- Swim deck platform fittings cleaned and resealed
- New Stainless steel name signs on Port, STB and Transom Door.
- New Liros 34mm Mooring lines with spliced leather eye
- 25 Meter 34mm x2
- 20 Meter 34mm X2
- 15 Meter 32 mmx 2
- New Neoprene Fender covers on all fenders
- All corrosion on the mast treated and repainted
- Sundeck sliding Doors Checked by Hofnagels and some guide wheels changed.
Tender & Toys
- X2 new Seadoo Trixx 2 up Jet skis 2022 Model
- X1 Yamaha Superjet Serviced
- New Beach Setup Equipment:
- X1 Weber BBQ
- X2 Gazebos
- X 3 Picknick Tables
- X 10 Beach Chairs
- X 2 Umbrellas
- X 1 Set of Cutlery
Interior
- Carpet Cleaning
- Interior Marble Polished professionally
- Leather and suede treated
- Scratch and dent repairs done on the interior wood.
AV/IT
New AV/IT Equipment:
- X 13 New Apple Ipad mini 6, 64GB Space Grey
- X13 Iport Docking stations
- X1 Kerio NG511 Hardware Appliance
- X1 Intel NUC 7 for management c/w SSD, DD & License
- Pepwave Sim Injector
- Pepwave Maritme 5G Antenna
Work done on the AV/IT System:
- Installation and configuration of 5G system c/w antennas
- Service and maintenance of the 2 x TVRO antennas system and 1 x VSAT system.
- Installation and configuration of x1 Kerio control with licenses
- Installation and configuration of x1 Management NUC with licenses
- VBH did the labour for reverse engineering, installation, configuration & commissioning the IT network onboard.
- VBH did the labour for reverse engineering, installation & commissioning the AV system onboard.
Main engines
- top end overhaul done
- replaced sea water and coolant pumps
- replaced heat exchanger plates with new gaskets
- 3 way solenoid valves replaced
- oil analysis done
Gear boxes
- yearly maintenance (oil change and oil cooler cleaning done)
Generators
- complete major overhaul done with new injectors, turbochargers, pumps, pistons, jackets etc.
- tested all alarms and sensors
Halyard exhaust system
- yearly survey and system check done by Halyard technicians
- both separator boxes have been repaired
Shore power converter
- Complete overhaul done on all 3 modules, replaced all components and cooling fans
Naiad stabilizers
- replaced hydraulic cylinders
- replaced valve cartridges
- replaced hydraulic hoses
- replaced potentiometers
- oil and filters replace replaced
Fresh water system
- Hot water boilers replaced
- Water softener complete overhaul
- Carbon filter complete overhaul
- Water maker salinometer and regulating valve replaced
- all freshwater tanks cleaning and touch up done
- UV lamp and sensor replaced
- Fresh water analysis done
- silver ionizer anode replaced
- deck wash unit replaced membranes, filters and display
HVAC
- oil replaced in both compressors
- compressor oil analysis
- condenser cleaning done
- glycol analysis
- all fan coils cleaning
- replaced 6 noisy blowers on fan coils around cabins
- complete duct cleaning done (extraction lines, supply lines, recirculation lines) including galley and laundry duct cleaning
- galley extraction fan and motor bearings replaced
- making unit motor and fan bearings replaced
Sewage system
- all black and grey water lines cleaned with chemicals from each toilet and sink
- Hamman plant maintenance done (replaced air distribution block, all valve actuators have been overhauled, replaced UV lamp)
- Sewage tank has been cleaned and repainted
RWO Oily water separator
- survey and maintenance done by authorized company (certificates issued, calibration done, replaced filters, replaced solenoids
Air system
- replaced screw pump
- yearly maintenance done (replaced oil, filters, water separators)
Bow thruster
- gearbox oil replaced
Anchor windlasses
- gearbox oil replaced
- brake pads replaced
Steering gear
- power pack oil and filters replaced