#edmiston-espec {
font-family: 'Helvetica Neue LT Std', 'Sans'
font-weight: 200;
font-style: normal;
text-align: justify;
text-justify: inter-word;
line-height: 1.5em;
color: #444;
}
#edmiston-espec table { border-spacing: 0px; border-collapse: collapse; }
#edmiston-espec td { text-align: left; vertical-align: top; padding: 0px; margin: 0px; line-height: 1.5em; }
#edmiston-espec th { text-align: left; vertical-align: top; padding: 0px; margin: 0px; width: 5cm; }
#edmiston-espec h1 { font-family: 'Times New Roman','Serif' color: #DB001E; }
#edmiston-espec h2 { font-family: 'Times New Roman','Serif' color: #DB001E; }
#edmiston-espec h3 { font-family: 'Times New Roman','Serif' color: #222; }
#edmiston-espec ul { list-style: none; margin: 0; padding: 0 0 0 20px; }
#edmiston-espec li.bullet { list-style: disc; }
- MAIN CHARACTERISTICS
TYPE - Motor Yacht
HULL NO - C 20/2
BUILDER - Mondomarine
NAVAL ARCHITECT - Mondomarine
EXTERIOR DESIGN - Cor D. Rover
INTERIOR DESIGN - Harrison Eidsgaard - refit
- Frederic Mechiche & Luca Dini Design - original
YEAR - 2009
REFIT - 2013
CLASSIFICATION - Lloyd’s Register: 100 A1 SSC Yacht Mono
- G6 LMC; MCA Compliance
CONTRUCTION - Steel Hull, Light Alloy Superstructure, Teak Decks
HULL COLOUR - Metallized Silver
FLAG - Cayman Islands
ENGINES - 2 x 2,480Hp MTU 12V 4000 M71
GT - 499
DISPLACEMENT - 475 tons (@ full load)
- DIMENSIONS
LOA - 50.80m / 161’8’’
BEAM - 9.30m / 30’6’’
DRAFT - 2.60m / 8’6’’
- SPEED & RANGE UNDER POWER
MAXIMUM SPEED - 18 knots
CRUISING SPEED - 15.5 knots
FUEL CONSUMPTION - 600 litres/ hour
RANGE - 4,000 nm @ 12 knots approx.
- CAPACITIES
ACCOMMODATION - 10 + 2 x Guests in 5 x Cabins + convertible sky lounge
CREW - 9 x Crew in 5 cabins
FUEL - 85,000 litres / 22,454 US gallons
FRESH WATER - 16,000 litres / 4,226 US gallons
WATER MAKERS - 2 x 5,500 / 2 x 1,452 US gallons per day
LUBE OIL - 1,490 litres / 393 US gallons
DIRTY OIL - 1,490 litres / 393 US gallons
- ACCOMMODATION
MAIN DECK - Exterior aft deck lounge area
- Main salon with fold out balconies
- Central elevator
- Full beam master cabin forward
MASTER CABIN - Main deck, large king size bed centrally placed on the forward bulkhead with comfortable sitting areas, entertainment system & en-suite master bathroom
LOWER DECK - 2 x Double cabins (can convert into 1 x full beam VIP suite)
- 2 x Twin cabins
- All 4 cabins have en-suite bathrooms with showers
- Central elevator
- Garage aft
UPPER DECK - Sky lounge cinema can be converted into a 6th cabin with en-suite
- Exterior aft deck seating area with shading option
- Dining table for up to 12 with large semi-circular
- sliding glass window for alfresco dining
- Bar
- Central elevator
- Access to the pool with shading option
SUN DECK - Sunbathing set-up aft
- Central lounge area with shading
- Forward lounge area with a set of semi-circular lounge pads
CAPTAIN & CREW - 1 x Double Captain’s cabin on upper deck
- 4 x 2-Bunk crew cabins on lower deck, forward
- MECHANICAL EQUIPMENT
ENGINES - 2 x MTU 12V 4000M71 ; 2,480 Hp /1,850 kW
ENGINE HOURS - 3,648 hours each as of 17/10/19
ENGINE YEAR - 2009
EXHAUST - Discharge below water level with bypass above water level for low speed operation
GEARBOX - ZF
PROPELLER - Detra Custom Made
PROPELLER SHAFTS - Arnaval, diameter according to Lloyd’s Register classification
STABILISERS - VT Naiad Marine system 620
BOWTHRUSTER - Vosper Thornycroft 60 kW
GENERATORS - 2 x 105 kW Northern Lights M1066A1 50 Hz
GENERATOR HOURS - As of 17/10/19
- Port: 8,618 / Stbd: 8,658 hours
ELECTRICITY - 24V DC switch board
- 380V AC 3-phases
- 220V single phases
- 24V DC circuit
SHORE POWER - 1 x For TV
- 1 x For telephone
- 1 x For fresh water
LIGHTING - Watertight lights on bulwark, cockpit, sun-deck & stairs
BATTERIES - Gel Type
GENERATOR START - 24V Batteries
CHARGERS - Automatic
EMERGENCY - For none-less than 4 x hours for all communication, navigation, lighting & radio
HYDRAULICS - 1 x Main unit for transom door & gangway, side folding ladder & aft crane
- 1 x Unit for fore–crane operation
- 1 x Unit for steering system
VENTILATION - ER 2 x G&R extractors
- 2 x G&R fans
AIR CONDITIONING - Il Frigorifero
- 2 x Chiller units
- 2 x Sea-water pumps
- Temperature controlled by thermostats fitted in each room with control fan speed at three positions
FRESH AIR SUPPLY - Air ducting system with air handling units of minimum 25m cubed per hour
AIR COMPRESSOR - 1 x 50 litres bottle for horn & engine room
WATER MAKER - 2 x Idromar MC5 (with sand filters & flow counters)
WATER SYSTEM - 1 x Electric hydrophor
- 2 x Electric pumps 380V
HOT WATER - 2 x Electric boilers of 150 litres each
- UVA treatment installation according to Lloyds
- Register classification
TOILET SYSTEM - Jet vacuum system
SEWAGE TREATMENT - Hamann
FUEL SEPARATOR - Westfalia Minimax OTC2 – 380V 3-phases 50 Hz
FUEL FILTERS - Double Racor filters on engines & generators
- NAVIGATION QUIPMENT
NAVTEX - 1 x Navtex NX 700
UNDER WATER LIGHTS - Subwater lights on transom & on each side
MONITORING - Main monitoring system in wheelhouse
- 3 x Fixed cameras, 1 x each side & 1 x aft
- 1 x Motorized camera in engine room
- 1 x Monitor in wheelhouse
- 1 x Monitor in crew mess
AIS - 1 x AIS 150 System
GMDSS - 1 x GMDSS
LOUDHAILER - 1 x Kahlenberg horn
- COMMUNICATION EQUIPMENT
SATCOM - TV-Seatel UK Sky HD in all guest areas
INMARSAT-C - 1 x FELCOM 15
VHF - 1 x VHF FM 8800
- 1 x VHF FM 2721
SSB - 1 x SSB 1570 DSC
TELEPHONE EXCHANGE - 1 x Pabx
- 1 x Intercom
CELLULAR - 1 x GSM phone
INTERNET - VSAT broadband 1024/256 upgradeable
- Cisco WLAN (Wireless Local Area Network)
- 2 x 4G Mobile Internet
- Kerio, Internet access controller
AV SYSTEM - AMX Logic with iPad controllers
- DECK EQUIPMENT
ANCHOR WINDLASS - 2 x Electric windlasses Opem ASLG 19 supplied by 380V – 3-phases
AFT WARPING CAPSTANS - 2 x Electric capstans Opem ATLG 35 supplied by 380V – 3-phases
ANCHOR CHAINS - 2 x 150 m chains Ø 19 mm
- 1 x Anchor chains washdown integrated in bilge/fire system
BOLLARDS - 12 x Bollards by Mor Saverio according to plans
SIDE BOARDING LADDER - 1 x Mor Saverio
SWIM LADDER - 1 x Stainless steel swim ladder
GANGWAY - 1 x Gangway Mor Saverio
SWIMMING PLATFORM - 1 x Swim platform accessed throught an electro hydraulic transom door
CRANES/ DAVITS - 2 x Hydraulic fore deck cranes SOLAS compliant
ELEVATOR - Serving 3 x decks (lower, main & upper)
- ENTERTAINMENT EQUIPMENT
- 5 x Airplay Device
- 2 x Apple TV in Cinema & Owner’s suite
- 2 x iPad with Retina display 16 GB in Cinema, Owner's suite & master control
- 1 x 70" Sharp TV in Cinema lounge
- 1 x 46" Ultra Narrow public display for Owner's suite
- 2 x 46" Slim public display for VIP cabins
- 2 x 40" Slim public display for Guests cabins
- 2 x AV Receivers in Cinema & Owner’s suite
- 2 x AV Receivers front HDMI Input in Guest cabins
- 6 x iPad Mini (1 x in 4 guests cabins, 1 x on sun deck, 1 x by the pool)
- 1 x Game console; X Box 360, 250 GB, Kinect, 2 x Controllers
- GALLEY & LAUNDRY EQUIPMENT
- All Miele household appliances
- 3 x Custom made Frigomar refrigerator/freezers
- SAFETY & FIRE FIGHTING EQUIPMENT
- SAFETY
- 4 x Switlik, DPS, Viking
- 4 x Ring buoys stored in recesses with vessel identification as required by Solas
- FIRE FIGHTING
- 1 x Alarm panel in wheelhouse
- 1 x Alarm panel in crew mess
- 1 x FM200 fire fighting system
- Portable powder &/or CO2 &/or foam fire-extinguishers in each room & engine room
- Smoke & eat detectors are installed
- SAFETY
- TENDERS & WATERSPORTS EQUIPMENT
- TENDER
- 1 x Castoldi Jet Tender 19S
- WATER SPORTS
- 2 x Yamaha VX Cruiser Wave Runner
- 2 x Sea Bob Cayago F7
- 1 x Junior skis
- 1 x Adult skis
- 1 x Slalom ski
- 1 x Wakeboard including bindings for women
- 2 x 1-person towable tubes
- 1 x Double person tube
- 1 x Towable banana tube
- TENDER
- REFIT SUMMERY
- INTERIOR & EXTERIOR DESIGN
- Harrison Eidsgaard, under the direction of Ben Harrison, Creative Director, transformed the interior into an open, welcoming space—existing elements were enhanced to create a relaxing, warm environment.
- Ben Harrison combined bespoke furniture from Davidson, Glyn Peter Michin, and Silverlining; floor coverings from Stark and Oliver Treutlein; and fabrics and leathers from Abbott & Boyd, Altfield, and Spinneybeck to create the new interior and exterior ambiance. Vedder G.m.b.H, the interior contractors, worked closely with Eidsgaard throughout to deliver precision drawings and finally, a precision interior for the Owner.
- HIGHLIGHTS OF THE INTERIOR DESIGN WORKS
- New 190mm oak planking throughout, with custom fabricated carpet insets in seating & sleeping areas
- New fabric panels throughout, light designs replaced the original dark mahogany
- Cabinet & wardrobe doors re-covered in complementary fabrics
- All new interior furniture to complement the design aesthetic
- New window treatments throughout
- Handcrafted tables for both interior & exterior use
- New consoles in main deck saloon with cold storage incorporated inside
- Complete alteration of the Owner’s Suite, including new side tables, new ceiling corniche panels & the bed frame re-covered in leather, custom woven leather coverings on outboard cupboards, wardrobe layout improved, new flooring & window treatments to suit
- Guest cabins updated with fabric covered ceiling & wall panels
- Sound deadening division added between the aft VIP cabins
- New mattresses & linens throughout
- Bespoke & tasteful dressing of the yacht
- Day heads & en-suites updated with new stone floor laid with underfloor heating, & including matching stone sink countertops
- New flooring installed in wheelhouse, radio room, & captain’s cabin
- Improved crew laundry area, with new dryer roller iron & storage space
- Crew area en-suites floors re-done
- Crew area dishwasher added
- Crew mess re-upholstered
- New laundry area added including new washer & dryer, in garage
- Elevator recommissioned
- Aft door window replaced & doors serviced
- Door added to interior of bridge
- Captain’s cabin modified for improved efficiency
- HIGHLIGHTS OF THE EXTERIOR DESIGN WORKS
- New awning added to aft upper deck
- Upper deck storage consoles added & colour matched to exterior finish
- Custom exterior furniture designed & installed
- Aft deck seating added
- TECHNICAL WORKS COMPLETED
- Mondomarine, SCM, Metaltecnica, Seateak & others completed the technical works on board
- All relevant works were completed under approval from Lloyds Register & the Maltese flag
- HIGHLIGHTS OF THE STRUCTURAL WORKS
- Swim platform extension & installation of an Opacmare hydraulically operated platform
- 2 x SCM sliding doors added in the main deck salon, port & starboard to allow direct access to the fold-out balconies
- HIGHLIGHTS OF THE MECHANICAL WORKS
- Alteration of the exhaust system with sound dampening silencer units to reduce noise & vibration on board – up to 23% noise reduction achieved
- New anodized floor plates in the engine room
- New custom tender launching system installed
- New workshop/bench in engine room, including 2 x Snap-on tool boxes
- Garage crane removed to add space
- Engine room access from main deck altered to be hydraulically operated & silent
- All hull valves overhauled & re-installed
- Sea chests cleaned & strainers changed
- All galley equipment serviced
- New boiler installed for double the hot water production capacity
- All tanks cleaned & coating repaired as necessary
- Stabilizers repaired & fully serviced
- Black water treatment plant rebuilt
- Watermaker serviced
- Watersoftener installed
- Water mist fire extinguishing system recommissioned
- Racor fuel filters installed
- Engine room bilges cleaned & degreased
- Overflow system for service fuel tank improved
- TECHNOLOGY
- VSAT & Satellite TV system added
- Complete upgrade to on board Wi-Fi network
- AV system updated, with full iPad control
- Alarm & monitoring system updated & programming adjusted
- Light control system on board updated & programming adjusted
- LRIT added for IMO compliance
- Navigation equipment serviced
- SAFETY / OPERATIONS
- Safety equipment updated & surveyed to Class & Flag’s satisfaction
- New charts & all logbooks updated
- Planned maintenance system implemented
- Draught marks & plymsole markings reinstated as per Class & Flag requirements
- Full, updated set of drawings produced, both .dwg & .pdf, incorporating the new GA, dimension changes, name changes & corresponding updated safety plan
- EXTERIOR / TECHNICAL AREAS
- Teak sanded & repaired where necessary
- Teak storage added in garage
- Paint repaired in areas around pool & other high traffic areas
- Transom repainted
- Bow repainted
- Underwater lights replaced with LED & 2 additional lights added on port & starboard sides near stern
- Forepeak hatch closing system improved
- Windlasses serviced
- Locker latches & hinges serviced & replaced where necessary
- More storage added in aft exterior areas
- Shower added on swim platform
- New, larger bollards installed on the swim platform
- New illuminated name installed on transom w/port of registry in stainless steel below
- Rub rail stains removed & rub rail resealed
- New awning added aft upper deck
- Underwater areas blasted to bare metal, with the full system for Micron 77 antifouling, under supervision by International Paints, including full manufacturer’s warranty
- Anodes replaced
- New teak & handrails installed on swim platform
- New handrails added around foredeck pool area for added safety
- INTERIOR & EXTERIOR DESIGN